• A-PLUS Terminal, Frankfurt Airport (Photo: Fraport AG)
  • United Nations Campus, Bonn

UNIVERSITY HOSPITAL DÜSSELDORF

Center for Operative Medicine II

Project Period: 2008 – 2010

4 buildings with four to five floors each - approx. 20,000 square meters

Temporary heating for interior construction work and object monitoring. Daily monitoring of temperatures, energy supply, restructuring work and additional services.

Temperature requirements: 12 °C – 1 °C

Overall Heating and Dehumidification Capacity: 4 mW 

THE SQUAIRE - AIRRAIL-CENTER, FRANKFURT

Project Period: 2008 – 2010

Construction heating in winter: Delivery and set-up of heating system of 81 units with an overall power capacity of 14,800 kW.

A significant reduction in drying times was achieved. 

AUDI, HUNGARY

Project Period: 2011 – 2012

For the construction of the new Audi production facilities in Hungary, HELOT provided 16 mobile heating HTL 200 units to accelerate the drying-out period. 

Total power: 3200 kW 

AOK, DORTMUND

HELOT provided twelve H200 units, lockable thermostats, double-walled 2000 l tanks and 500 m flexible air distribution with flexible hot air hoses. 

FRANKFURT AIRPORT A-PLUS, FRANKFURT

Large Construction Site: H 200 units (×44 )

Total capacity: approx.  8800 kW 

MAX PLANCK INSTITUTE, COLOGNE

New Construction of Max Planck Institute: Heating, Air Conditioning, Drying out 

101,080 m³ of enclosed space 

NATO AIRFIELD, NÖRVENICH

Construction heating in winter

Total capacity: approx. 2240 kW 

Helot Products

  • H 3000 Ventilation and Exhaustion
  • H 100 Oil Fan Heater
  • AK 02 Drying Equipment
  • HEL 10 Electric Fan Heater
  • Dehumidifier Type II Drying Equipment


  • Winterbaubeheizung Newsletter
  • PRODUCTS-HELOT
    complete catalog