• Mobile tent heating at Vierschanzentournee powered by HELOT
  • HELOT Event Services at BMW International Open 2012
  • FORST BREWHOUSE OPENING | FORST | 2011
  • BREAD & BUTTER | BERLIN | 2011

EVENTS SUCCEED WITH PERFECT PLANNING AND INFRASTRUCTURE

The language of the theatre describes it best: Ensuring the success of your event means putting on a good show – both on and off stage. For this, we are a competent partner by your side – especially when things are a bit tricky and challenging. We provide the engineering, design & consulting of your event - even in unusual and "impossible" locations.

We will also provide appropriate HELOT-technology – reliable power supply for pleasant climate in both summer and winter, and, of course, we also take care of the security lighting. Learn more about how we can help with your event, so you can focus on the show and your guests. 

BAUMA FAIR 2016

  • Client: various
  • Date: 2016
  • Location: München
  • 21.430 kW Heating Capacity
  • 3.025 kW Air Conditioning
  • Set up: 24h on site service

ENI MOTORRAD GRAND PRIX DEUTSCHLAND

  • Client: Sachsenring-Rennstrecken Management GmbH
  • Date: July 2013
  • Location:  Sachsenring
  • 280 kW Air Conditioning
  • 24h on site service
  • Set up service 

JUMPING TOURNAMENT VIERSCHANZENTOURNEE

  • Client: Skisport & Veranstaltungs GmbH
  • Date: Winter 2012
  • Location:  Erdinger Arena, Allgäu
  • 200 kW Heating Capacity
  • 24h on site service
  • Set up service 

BMW International Open 2012

  • Client: BMW
  • Partner Agency: Ranzinger & Stamml
  • Date: 18.-24. June 2012
  • Location: Golf Club Gut Lärchenhof, Pulheim
  • 2.200 kW Heating Capacity
  • 900 kW Air Conditioning
  • 1.500 kVA Generators in twin operation
  • 24h on site service
  • Fuel Supply & Service 

TOM TAILOR

  • Client: Tom Tailor
  • Set up of Fair, Decoration & Tents: Freibauten
  • Date: Summer 2012
  • Location: Berlin
  • 200 kW Heating Capacity
  • 100 kW Air Conditioning
  • Set up: 24h on site service

PALAS

  • Client: Losberger
  • Date: June 2012
  • Location: Bad Rappenau
  • 200 kW Heating Capacity
  • 150 kW Air Conditioning
  • Set up: 24h on site service

FASHION WEEK

  • Client: Mercedes-Benz
  • Partner Agency: Nowadays
  • Date: Summer 2012
  • Location: Berlin
  • 2880 kW Heating Capacity
  • 2080 kW Air Conditioning
  • Set up: 24h on site service 

GHPC

  • Partner Agency: DO&CO
  • Date: Winter & Summer 2011/2012
  • Location: Kärnten, Österreich
  • 800 kW Heating Capacity
  • 600kW Air Conditioning
  • Set up: 24h on site service 

CHIO

  • Client: Aachener Equestrian Event
  • Date: July 2012
  • Location: Aachen
  • 2000 kW Heating Capacity
  • 950 kW Air Conditioning
  • Set up: 24h on site service 

FASHION WEEK

  • Client: Mercedes-Benz
  • Partner Agency: Nowadays
  • Date: Summer/Winter 2010/2011
  • Location: Stuttgart
  • 2880 kW Heating Capacity
  • 2080 kW Air Conditioning
  • Set up: 24h on site service 

BAUMA FAIR

  • Client: Neptunus
  • Date: 2010
  • Location: München
  • 14.400 kW Heating Capacity
  • 1050 kW Air Conditioning
  • Set up: 24h on site service 

BREAD & BUTTER

  • Client: Levis, Wrangler, Diesel
  • Partner Agency: Bread & Butter
  • Contractor: Energyst
  • Date: Juli 2011
  • Location: Berlin
  • 1.600 kW Heating Capacity
  • Set up: 24h on site service 

FORST BREWHOUSE

  • Client: Brauerei Forst AG
  • Partner Agency: Marbet
  • Date: Juni 2011
  • Location: Algund / Italien
  • 1.000 kW Heating Capacity
  • 750 kW Air Conditioning Capacity
  • Complete Energy Supply Grid 
  • Safety and Panic Lighting
  • Set up: 24h on site service

LAPP "50 YEARS OILFLEX"

  • Client: Lapp Kabel
  • Partner Agency: Freibauten
  • Date: Juli 2011
  • Location: Stuttgart
  • 600 kW Heating Capacity
  • 750 kW Air Conditioning Capacity
  • Safety and Panic Lighting
  • Set up: 24h on site service

CHIO

  • Client: Aachener Equestrian Event
  • Date: July 2011
  • Location: Aachen
  • 2000 kW Heating Capacity
  • 950 kW Air Conditioning
  • Safety and Panic Lighting
  • Set up: 24h on site service 

HUGO BOSS "RACE IN THE CITY"

  • Client: Hugo Boss
  • Partner Agency: Liganova
  • Date: Juli 2011
  • Location: Metzingen
  • 400 kVA Twingenerator
  • Set up: 24h on site service 

EUREGIO

  • Client: Euregio TRADE SHOW
  • Date: 2010, 2011 & 2012
  • Location: Aachen
  • 7.600 kW Heating Capacity
  • 1200 m hose system for air conditioning
  • Set up: 24h on site service

Helot Products

  • Traverse system Montage system
  • Special Fair Hose Hose System
  • Container Tank 2000 l DW Heating Oil Container
  • Terrace Heater
  • Pac 5.0 Air Conditioner


  • PRODUCTS-EVENT
    complete catalog
  • HELOT System Event-Newsletter (German)
  • Helot Event Booklet (German)
  • PRODUCTS-HELOT
    complete catalog